I wanted to end this project with a few shots of the furniture.  I like to supply a few pieces just to get things started.  Then its up to the new owner to get as creative as they like.
For a little additional charge you can have your cabin completely furnished and just move on in!

Thanks to all of you who have followed this project throughout its completion and I welcome you to  take a look at my newest project already started on the Smith River.




Friday, August 31, 2012

Ready To Move In

Well our cabin is nearly complete.
In the last few weeks we have installed the door and windows, and finished off the interior.
We have a new kitchen and bath, complete with new appliances and fixtures.  The interior walls have been covered with blue stained pine and varnished to match the wall logs.  All that's left is to build a rock base and install the wood burning stove.  We will be doing a little finish landscaping to give the place a little more inviting feel.  Finally we will furnish the cabin with a few nice starter pieces of log furniture.
Here are a few photos of what the cabin and site look like today.   Hopefully you see a marked improvement from where we started and that we have created a cabin someone will be able to enjoy for many years to come.















































Monday, August 6, 2012

Interior Work



While waiting for the metal roofing to show up, I have been working on the interior of the cabin.  I have framed up the interior walls, got all of the plumbing and wiring roughed in and put up most of the1x6 blue stained pine and trim. You may notice that the loft now has its posts, rails and stairs installed.  I also managed to get the exterior of the cabin chinked (caulked), and stained.  I will post some photos of the new roof and exterior next week.

Sunday, July 1, 2012

Taking Shape

Here is the cabin taking its final shape.
We finished putting up all of our main support beams, finished our loft, and made the final gable cuts.
Next we set our front porch posts and rails and porch support beam.  All hand peeled from the property.
Then we began putting up our roof decking one section at a time. The roof decking is 2x6 tongue and groove pine.
.






Once decked you get the full picture of what the cabin will eventually become.

Saturday, June 23, 2012

Beams Going Up!

Here are a few shots of one of the ways we use to get our beams up onto the cabin.  The beams are 36' long and 10 to 12 inches in diameter, making them far to heavy to lift by hand.  We used the winch on Tom's truck to pull the logs up the opposite side of the cabin.  A temporary post is anchored to the front wall of the cabin to hang a pulley on.


It's always fun to see these logs go up.  Along with enhancing the appearance of the cabin these beams provide a substantial snow load support.  

Sunday, June 17, 2012

Friday, April 27, 2012

Foundation For The Montanan

The weather has been great and we are making progress.

  Foundations can be as varied as the locations you choose to build your cabin on, but the goal is always the same.    We want a solid base which lasts and protects.
Whenever possible I like to use the natural landscape in my foundation designs. I hate scarring the site with excessive cuts and leveling.
For this purpose, I used a two level design which eliminated the need to cut deeper into the hillside.
The upper portion of the foundation will mainly support bedrooms and therefore need less of a crawl space.  The lower portion of the foundation will contain our plumbing and most of the electrical
and so here is where I want a crawl space which is easily accessible and tall enough to comfortably work under.
Here is how we did it.
First we poured an 8x16 inch footer around the entire perimeter. 
Next we built up with block until our wall was level all the way around.
We utilized some of the old trailer's foundation for retaining walls.
After that it was just a matter of attaching pressure treated plates and floor joists.